Shelters Install. 15 Min to 2 Days

All Bus and Rail shelters are designed for fast professional installation. A typical Rail Shelter where components are carried to railside takes just two days. Where access is possible Natural Shelters can be prefabricated offsite on a specially designed Ecocrete raft. The shelter is then delivered and craned into position in less than 15 mins. No major traffic or pedestrian disruption.

The offsite production of the shelter leads to our high Q&A standards being met and safer and healthier working conditions for staff. It also means that the foundation slab is supplied by Natural Shelter reducing groundworks for the transport operator. 

 

 

 
A 5m x 1.5m Natural Shelter being installed using a Hiab. The Ecocrete raft (85% secondary waste aggregate) and shelter are angled to accomodate a 4º slope. The electrics and protective duct are fed through a hole in the raft as the shelter is lower…

A 5m x 1.5m Natural Shelter being installed using a Hiab. The Ecocrete raft (85% secondary waste aggregate) and shelter are angled to accomodate a 4º slope. The electrics and protective duct are fed through a hole in the raft as the shelter is lowered into position. The entire operation took 15 minutes. Over 70 shelters have been installed in this fashion.